Well Completion

Skiagard offers Lower and upper Well Completion services to make a well ready for production (or injection). This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down-hole tools as well as perforating and stimulating as required. Sometimes, the process of running-in and cementing the casing is also included. We provide a variety of lower and upper completion services such as:

Lower Completions

  • Down Hole Pumping Services
  • Gravel Pack and Frac Pack equipment sale and installation
  • Sale and Installation of various types and sizes of Screens for Stand
  • Alone Screens (SAS) applications in both vertical and horizontal well sections
  • Seal bore packer, Seal subs etc

Upper Completions

  • Upper Completions Running Services
  • Thru Tubing Intervention Services
  • Sale of Production Tubing accessories such as Nipples, Blast Joints
  • Hydro-Trip subs, Couplings, Safety Valves, Sliding Sleeves, Telescopic joints, Seal Units etc