Well Completion
Skiagard offers Lower and upper Well Completion services to make a well ready for production (or injection). This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down-hole tools as well as perforating and stimulating as required. Sometimes, the process of running-in and cementing the casing is also included. We provide a variety of lower and upper completion services such as:
Lower Completions
- Down Hole Pumping Services
- Gravel Pack and Frac Pack equipment sale and installation
- Sale and Installation of various types and sizes of Screens for Stand
- Alone Screens (SAS) applications in both vertical and horizontal well sections
- Seal bore packer, Seal subs etc
Upper Completions
- Upper Completions Running Services
- Thru Tubing Intervention Services
- Sale of Production Tubing accessories such as Nipples, Blast Joints
- Hydro-Trip subs, Couplings, Safety Valves, Sliding Sleeves, Telescopic joints, Seal Units etc